Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 62,000
ft2
Annual Production 100
units
Production Hrs. Annual 3,427
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,459 646,088
kWh
Electricity Demand $48,914 3,700
kW-mo/yr
Natural Gas $15,790 1,592
MMBtu
TOTAL YEARLY COSTS $92,163
RECOMMENDED SAVINGS* $23,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5123: Reduce fluid flow rates $1,882 $3,000 $1,882
44,289
kWh
- -
02 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $2,608 $2,000 $603
14,180
kWh
- $2,005
-
MMBtu
03 2.9114: Use solar heat to make electricty $19,396 $343,249 $12,878
303,020
kWh
$6,518
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,886 $348,249 $15,363
361,489
kWh
$6,518
-
kW-mo/yr
$2,005
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs