ITAC Assessment: AM0814
ITAC logo
ITAC Assessment: AM0814
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Lighting products
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 220,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,117
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,805 2,326,200
kWh
Electricity Demand $66,317 8,354
kW-mo/yr
Electricity Fees $18,788 -
Natural Gas $33,920 5,093
MMBtu
TOTAL YEARLY COSTS $198,830
RECOMMENDED SAVINGS* $92,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $74,300 $7,400 - - $14,860 - $59,440
02 2.6218: Turn off equipment when not in use $7,570 $2,000 $5,230
153,700
kWh
$2,340
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $6,460 $9,830 - $6,460
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $1,000 $680
19,980
kWh
$860
-
kW-mo/yr
- - -
05 2.4157: Establish a predictive maintenance program $1,470 $4,340 $150
4,320
kWh
$190
-
kW-mo/yr
- $1,130 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $500 $25 $220
6,470
kWh
$280
-
kW-mo/yr
- - -
07 2.8123: Pay utility bills on time $490 - - - - $490 -
08 2.4314: Use synthetic lubricant $300 $200 $130
3,930
kWh
$170
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $92,630 $24,795 $6,410
188,400
kWh
$10,300
-
kW-mo/yr
$14,860 $1,620 $59,440
TOTAL IMPLEMENTED $86,170 $14,965 $6,410
188,400
kWh
$3,840
-
kW-mo/yr
$14,860 $1,620 $59,440
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs