ITAC Assessment: UM0450
ITAC logo
ITAC Assessment: UM0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Industrial Washers
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 132,500
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,636 1,753,885
kWh
Natural Gas $77,969 10,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $58,763 $200,000 $93,436
772,200
kWh
$(-34,673.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,421 $26,000 $23,421
207,286
kWh
-
03 2.1221: Replace obsolete burners with more efficient ones $23,065 $22,600 - $23,065
-
MMBtu
04 2.7244: Revise smoke cleanup from operations $14,049 $6,000 - $14,049
-
MMBtu
TOTAL RECOMMENDED $119,298 $254,600 $116,857
979,486
kWh
$2,441
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs