ITAC Assessment: AM0812
ITAC logo
ITAC Assessment: AM0812
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,716 1,182,980
kWh
Electricity Demand $18,364 2,270
kW-mo/yr
Electricity Fees $1,450 -
TOTAL YEARLY COSTS $63,530
RECOMMENDED SAVINGS* $15,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,250 $1,000 $7,250
196,000
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,970 $4,220 $2,260
61,000
kWh
$710
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $2,250 $3,410 - $2,250
-
kW-mo/yr
- - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,980 $150 $1,220
32,900
kWh
$760
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $750 $510 $750
20,200
kWh
- - - -
06 2.4156: Establish a preventative maintenance program $475 $2,250 $555
15,000
kWh
$170
-
kW-mo/yr
- $(-810.0) $560
07 2.8112: Combine utility meters $100 $17 - - $100 - -
TOTAL RECOMMENDED $15,775 $11,557 $12,035
325,100
kWh
$3,890
-
kW-mo/yr
$100 $(-810.0) $560
TOTAL IMPLEMENTED $15,775 $11,557 $12,035
325,100
kWh
$3,890
-
kW-mo/yr
$100 $(-810.0) $560
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs