ITAC Assessment: OR0809
ITAC logo
ITAC Assessment: OR0809
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 4
Plant Area 1,325,904
ft2
Annual Production 1,170,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,507 1,184,640
kWh
Electricity Demand $36,050 2,477
kW-mo/yr
Electricity Fees $9,690 -
Natural Gas $6,203 527
MMBtu
Waste Disposal Costs
Water Usage $1 1,170,000
Tgal
TOTAL YEARLY COSTS $137,451
RECOMMENDED SAVINGS* $37,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $2,572 - - - $2,572
-
MMBtu
02 2.6127: Maintain air filters by cleaning or replacement $1,470 - $1,470
20,367
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $7,728 $75,000 $7,728
107,064
kWh
- -
04 2.9114: Use solar heat to make electricty $25,482 $215,860 $16,240
224,937
kWh
$9,242
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,252 $290,860 $25,438
352,368
kWh
$9,242
-
kW-mo/yr
$2,572
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs