Assessment Year | 2022 |
---|---|
Principal Product | Metal Manufacturing |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
320,000
ft2
|
Annual Production | 11,000
units
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $49,922 | 988,560 |
kWh
|
$0.050 | |
Electricity Demand | $32,142 | 3,661 |
kW-mo/yr
|
$8.78 | |
Electricity Fees | $10,435 | - |
|
- | |
LPG | $20,528 | 2,815 |
MMBtu
|
$7.29 | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $20,539 | 864,376 |
lb
|
$0.024 | |
TOTAL YEARLY COSTS | $133,566 | ||||
RECOMMENDED SAVINGS* | $15,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $15,150 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,277 | $3,687 |
$2,658
52,641
kWh
|
$618
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,156 | $11,363 |
$2,032
40,240
kWh
|
$124
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $9,718 | - | - | - |
$9,718
-
MMBtu
|
|
TOTAL RECOMMENDED | $15,150 | $15,050 |
$4,691
92,881
kWh
|
$742
-
kW-mo/yr
|
$9,718
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,150 | $15,050 |
$4,691
92,881
kWh
|
$742
-
kW-mo/yr
|
$9,718
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs