Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product High density polyethylene plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 157,000
ft2
Annual Production 250,526
units
Production Hrs. Annual 8,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,449 3,759,324
kWh
Electricity Demand $73,143 9,450
kW-mo/yr
Electricity Fees $2,772 -
TOTAL YEARLY COSTS $345,364
RECOMMENDED SAVINGS* $45,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $12,243 $320 - - - $12,243 -
02 4.652: Replace existing equipment with more suitable substitutes $10,390 $800 $224
3,200
kWh
$16
-
kW-mo/yr
$18,400 - $(-8,250.0)
03 2.2614: Use cooling tower or economizer to replace chiller cooling $9,795 $2,700 $7,775
111,070
kWh
$2,020
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,453 $1,000 $3,992
57,024
kWh
$613
-
kW-mo/yr
$(-1,152.0) - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,462 $1,138 $3,462
49,460
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,095 $6,130 $1,453
16,911
kWh
$651
-
kW-mo/yr
- - $(-9.0)
07 2.4156: Establish a preventative maintenance program $1,430 $4,570 $7,650
109,300
kWh
$1,300
-
kW-mo/yr
$(-7,900.0) $380 -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,500 $16 $2,170
31,000
kWh
$330
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $604 $1,239 $604
6,713
kWh
- - - -
TOTAL RECOMMENDED $45,972 $17,913 $27,330
384,678
kWh
$4,930
-
kW-mo/yr
$9,348 $12,623 $(-8,259.0)
TOTAL IMPLEMENTED $11,044 $14,077 $17,161
239,408
kWh
$2,564
-
kW-mo/yr
$(-9,052.0) $380 $(-9.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs