ITAC Assessment: AM0786
ITAC logo
ITAC Assessment: AM0786
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4953: Refuse Systems
Sales Range less than $500
k
# of Employees 25
Plant Area 61,600
ft2
Annual Production 700,800
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,835 1,975,388
kWh
Electricity Demand $39,635 4,840
kW-mo/yr
Electricity Fees $5,177 -
TOTAL YEARLY COSTS $144,647
RECOMMENDED SAVINGS* $80,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $55,800 $67,044 $42,400
839,368
kWh
$13,400
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $11,700 $15,300 - $11,700
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,750 $22,600 $9,750
195,000
kWh
- -
04 2.4157: Establish a predictive maintenance program $2,760 $4,570 $1,930
38,664
kWh
$390
-
kW-mo/yr
$440
05 2.4314: Use synthetic lubricant $910 $290 $760
15,274
kWh
$150
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,920 $109,804 $54,840
1,088,306
kWh
$25,640
-
kW-mo/yr
$440
TOTAL IMPLEMENTED $80,920 $109,804 $54,840
1,088,306
kWh
$25,640
-
kW-mo/yr
$440
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs