ITAC Assessment: AM0782
ITAC logo
ITAC Assessment: AM0782
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 360,000
ft2
Annual Production 16,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,049,699 14,454,131
kWh
Electricity Demand $216,700 32,465
kW-mo/yr
Electricity Fees $55,756 -
Natural Gas $145,664 32,402
MMBtu
Waste Disposal Costs
Water Usage $793,644 107,854
Tgal
TOTAL YEARLY COSTS $2,261,463
RECOMMENDED SAVINGS* $88,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $55,500 $10,000 - - - - $11,100 $44,400
02 3.5131: Recycle white water $10,040 $50,000 - - - $10,040
-
Tgal
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,515 - $3,510
103,538
kWh
$2,005
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $9,870 $11 $6,940
208,400
kWh
$2,930
-
kW-mo/yr
- - - -
05 2.2113: Repair or replace steam traps $2,970 $188 - - $2,970
-
MMBtu
- - -
06 2.8114: Change rate schedules or other changes in utility service $3,612 $88 - - - - $3,612 -
07 2.8114: Change rate schedules or other changes in utility service $803 $88 - - - - $803 -
TOTAL RECOMMENDED $88,310 $60,375 $10,450
311,938
kWh
$4,935
-
kW-mo/yr
$2,970
-
MMBtu
$10,040
-
Tgal
$15,515 $44,400
TOTAL IMPLEMENTED $72,755 $10,375 $6,940
208,400
kWh
$2,930
-
kW-mo/yr
$2,970
-
MMBtu
- $15,515 $44,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs