ITAC Assessment: AM0777
ITAC logo
ITAC Assessment: AM0777
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pipe and couplings
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 125,000
ft2
Annual Production 425,600
pieces
Production Hrs. Annual 6,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,869 1,843,680
kWh
Electricity Demand $13,751 4,584
kW-mo/yr
Electricity Fees $2,586 -
Natural Gas $65,479 4,158
MMBtu
TOTAL YEARLY COSTS $236,685
RECOMMENDED SAVINGS* $20,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,772 $2,000 $11,010
131,068
kWh
$762
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,919 $890 $2,919
34,748
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,252 $7,860 $2,252
26,815
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,417 $9 $1,330
15,830
kWh
$87
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $982 $1,855 $917
10,914
kWh
$65
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $646 $191 $170
2,024
kWh
$11
-
kW-mo/yr
$167 $298
07 2.7111: Reduce illumination to minimum necessary levels $585 - $547
6,510
kWh
$38
-
kW-mo/yr
- -
08 2.7111: Reduce illumination to minimum necessary levels $91 $36 $88
1,051
kWh
$3
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,664 $12,841 $19,233
228,960
kWh
$966
-
kW-mo/yr
$167 $298
TOTAL IMPLEMENTED $15,493 $4,091 $14,062
167,397
kWh
$966
-
kW-mo/yr
$167 $298
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs