| Assessment Year | 2017 |
|---|---|
| Principal Product | Industrial chemicals |
| NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 169 |
| Plant Area |
100,000
ft2
|
| Annual Production | 400,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,492,030 | 51,624,000 |
kWh
|
$0.029 |
| Electricity Demand | $604,948 | 72,690 |
kW-mo/yr
|
$8.32 |
| Electricity Fees | $23,240 | - |
|
- |
| Natural Gas | $2,143,103 | 844,500 |
MMBtu
|
$2.54 |
| TOTAL YEARLY COSTS | $4,263,321 | |||
| RECOMMENDED SAVINGS* | $266,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,660 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $128,600 | $21,540 | - | - |
$128,600
-
MMBtu
|
- | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $56,575 | $50,400 |
$5,475
202,765
kWh
|
$2,400
-
kW-mo/yr
|
- | $48,700 | |
| 03 | 2.2135: Repair and eliminate steam leaks | $49,030 | $30,000 | - | - |
$49,030
-
MMBtu
|
- | |
| 04 | 2.3212: Optimize plant power factor | $13,470 | $39,270 | - |
$13,470
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,630 | $16,030 |
$6,700
248,000
kWh
|
$2,930
-
kW-mo/yr
|
- | - | |
| 06 | 2.4314: Use synthetic lubricant | $9,626 | - |
$6,688
247,720
kWh
|
$2,938
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $266,931 | $157,240 |
$18,863
698,485
kWh
|
$21,738
-
kW-mo/yr
|
$177,630
-
MMBtu
|
$48,700 | ||
| TOTAL IMPLEMENTED | $58,660 | $46,030 |
$6,700
248,000
kWh
|
$2,930
-
kW-mo/yr
|
$49,030
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs