Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 82
Plant Area 180,000
ft2
Annual Production 20,600,000
units
Production Hrs. Annual 4,772
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,858 6,153,846
kWh
Electricity Demand $154,147 20,216
kW-mo/yr
Electricity Fees $12,335 -
Natural Gas $82,431 24,693
MMBtu
TOTAL YEARLY COSTS $467,771
RECOMMENDED SAVINGS* $58,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $12,900 $23,700 - $12,900
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $12,700 - - - $12,700 -
03 2.4239: Eliminate or reduce compressed air usage $8,600 $340 $5,580
158,000
kWh
$3,020
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,230 $2,500 $3,390
96,100
kWh
$1,840
-
kW-mo/yr
- -
05 2.8121: Apply for tax-free status for energy purchases $10,380 $3,000 - - $3,460 $6,920
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,260 $3,480 $2,120
60,000
kWh
$1,140
-
kW-mo/yr
- -
07 3.6192: Use a less expensive method of waste removal $3,200 - - - $3,200 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $4,350 $1,230
34,900
kWh
- - -
09 2.4314: Use synthetic lubricant $860 - $560
16,000
kWh
$300
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $580 $980 $350
10,000
kWh
$230
-
kW-mo/yr
- -
TOTAL RECOMMENDED $58,940 $38,350 $13,230
375,000
kWh
$19,430
-
kW-mo/yr
$19,360 $6,920
TOTAL IMPLEMENTED $41,540 $33,890 $10,200
289,000
kWh
$17,760
-
kW-mo/yr
$6,660 $6,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs