ITAC Assessment: AM0713
ITAC logo
ITAC Assessment: AM0713
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Quicklime, dolime
NAICS 327410: Lime Manufacturing
SIC 3274: Lime
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 100,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $687,068 18,617,000
kWh
Electricity Demand $303,836 48,928
kW-mo/yr
Electricity Fees $3,277 -
Natural Gas $785,500 279,764
MMBtu
TOTAL YEARLY COSTS $1,779,681
RECOMMENDED SAVINGS* $526,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2421: Install waste heat boiler to provide direct power $453,910 $3,100,000 $342,500
7,446,000
kWh
$111,410
-
kW-mo/yr
02 2.3212: Optimize plant power factor $58,650 $76,000 - $58,650
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,870 $16,220 $3,940
85,750
kWh
$1,930
-
kW-mo/yr
04 2.4314: Use synthetic lubricant $4,600 - $3,150
68,440
kWh
$1,450
-
kW-mo/yr
05 2.4226: Use / purchase optimum sized compressor $3,460 $3,900 $3,460
75,320
kWh
-
TOTAL RECOMMENDED $526,490 $3,196,120 $353,050
7,675,510
kWh
$173,440
-
kW-mo/yr
TOTAL IMPLEMENTED $72,580 $96,120 $10,550
229,510
kWh
$62,030
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs