| Assessment Year | 2016 |
|---|---|
| Principal Product | Quicklime, dolime |
| NAICS | 327410: Lime Manufacturing |
| SIC | 3274: Lime |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
100,000
ft2
|
| Annual Production | 40,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $687,068 | 18,617,000 |
kWh
|
$0.037 |
| Electricity Demand | $303,836 | 48,928 |
kW-mo/yr
|
$6.21 |
| Electricity Fees | $3,277 | - |
|
- |
| Natural Gas | $785,500 | 279,764 |
MMBtu
|
$2.81 |
| TOTAL YEARLY COSTS | $1,779,681 | |||
| RECOMMENDED SAVINGS* | $526,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $72,580 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2421: Install waste heat boiler to provide direct power | $453,910 | $3,100,000 |
$342,500
7,446,000
kWh
|
$111,410
-
kW-mo/yr
|
|
| 02 | 2.3212: Optimize plant power factor | $58,650 | $76,000 | - |
$58,650
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,870 | $16,220 |
$3,940
85,750
kWh
|
$1,930
-
kW-mo/yr
|
|
| 04 | 2.4314: Use synthetic lubricant | $4,600 | - |
$3,150
68,440
kWh
|
$1,450
-
kW-mo/yr
|
|
| 05 | 2.4226: Use / purchase optimum sized compressor | $3,460 | $3,900 |
$3,460
75,320
kWh
|
- | |
| TOTAL RECOMMENDED | $526,490 | $3,196,120 |
$353,050
7,675,510
kWh
|
$173,440
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $72,580 | $96,120 |
$10,550
229,510
kWh
|
$62,030
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs