Assessment Year | 2016 |
---|---|
Principal Product | Plastic trash bags |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 2673: Plastics, Foil, and Coated Paper Bags |
Sales Range | $10 M to 50M |
# of Employees | 186 |
Plant Area |
190,000
ft2
|
Annual Production | 54,000,000
lb
|
Production Hrs. Annual | 8,472
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $679,235 | 15,704,684 |
kWh
|
$0.043 |
Electricity Demand | $466,694 | 37,360 |
kW-mo/yr
|
$12.49 |
Electricity Fees | $24,081 | - |
|
- |
Natural Gas | $6,872 | 827 |
MMBtu
|
$8.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,590 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $15,000 | $5,150 |
$15,000
374,500
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,480 | $4,000 |
$8,320
208,000
kWh
|
$3,160
-
kW-mo/yr
|
- | |
03 | 2.7122: Disconnect ballasts | $5,680 | $730 |
$4,100
102,530
kWh
|
$1,580
-
kW-mo/yr
|
- | |
04 | 2.4314: Use synthetic lubricant | $4,095 | - |
$2,950
73,987
kWh
|
$1,145
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,875 | $450 |
$1,675
41,930
kWh
|
$2,200
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,220 | $450 |
$880
22,000
kWh
|
$340
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,015 | $240 |
$200
4,945
kWh
|
$75
-
kW-mo/yr
|
$740 | |
TOTAL RECOMMENDED | $42,365 | $11,020 |
$33,125
827,892
kWh
|
$8,500
-
kW-mo/yr
|
$740 | ||
TOTAL IMPLEMENTED | $16,590 | $4,240 |
$11,470
286,932
kWh
|
$4,380
-
kW-mo/yr
|
$740 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs