ITAC Assessment: AM0686
ITAC logo
ITAC Assessment: AM0686
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Gears and couplings
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 7,800
pieces
Production Hrs. Annual 6,416
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,203 1,876,825
kWh
Electricity Demand $25,984 4,724
kW-mo/yr
Electricity Fees $6,131 -
Natural Gas $5,306 616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings
01 2.6218: Turn off equipment when not in use $9,770 - $9,770
131,000
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $2,790 - $2,090
28,000
kWh
$700
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $895 $5 $745
9,990
kWh
$150
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $4,390 $5,700 $4,390
58,800
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $455 $220 $400
5,360
kWh
$55
-
kW-mo/yr
- -
06 3.6112: Use filter and drying oven to reduce sludge volume $12,685 $17,600 $(-4,415.0)
(-59,160)
kWh
- - $17,100
-
gal
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,490 $500 $1,310
17,600
kWh
$180
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,915 $1,810 $1,685
22,600
kWh
$230
-
kW-mo/yr
- -
09 2.8123: Pay utility bills on time $1,789 - - - $1,789 -
TOTAL RECOMMENDED $36,179 $25,835 $15,975
214,190
kWh
$1,315
-
kW-mo/yr
$1,789 $17,100
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs