ITAC Assessment: AM0533
ITAC logo
ITAC Assessment: AM0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pipe Threading
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 156,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 7,390
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $489,732 6,248,796
kWh
Electricity Demand $102,785 14,955
kW-mo/yr
Electricity Fees $38,096 -
Natural Gas $110,596 12,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $273,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $98,110 $155,442 $87,240
1,014,400
kWh
$10,870
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $163,900 - - - $37,900 - $126,000
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,600 $700 $5,000
58,100
kWh
$600
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,395 $1,350 $590
6,870
kWh
$55
-
kW-mo/yr
- $2,750 -
05 2.7145: Install skylights $3,340 - $3,540
41,200
kWh
- - $(-200.0) -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,750 - $1,750
20,400
kWh
- - - -
07 2.4314: Use synthetic lubricant $1,350 - $1,180
13,700
kWh
$170
-
kW-mo/yr
- - -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $475 $65 $395
4,600
kWh
$80
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $277,920 $157,557 $99,695
1,159,270
kWh
$11,775
-
kW-mo/yr
$37,900 $2,550 $126,000
TOTAL IMPLEMENTED $273,230 $157,557 $94,975
1,104,370
kWh
$11,605
-
kW-mo/yr
$37,900 $2,750 $126,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs