ITAC Assessment: AM0492
ITAC logo
ITAC Assessment: AM0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Wooden cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 314,000
ft2
Annual Production 42,000
pieces
Production Hrs. Annual 4,489
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,889 669,528
kWh
Electricity Fees $4,539 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,500 $500 $9,500
122,000
kWh
-
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,500 $20,000 - $9,500
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,800 - - $4,800
04 3.6125: Sell combustible waste $3,600 $500 - $3,600
05 2.4239: Eliminate or reduce compressed air usage $2,800 $1,230 $2,800
35,700
kWh
-
06 2.7145: Install skylights $1,300 $3,670 $1,300
16,900
kWh
-
07 2.7261: Install timers and/or thermostats $600 $100 $600
7,600
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $275 $14 $275
3,560
kWh
-
TOTAL RECOMMENDED $32,375 $26,014 $14,475
185,760
kWh
$17,900
TOTAL IMPLEMENTED $28,500 $25,500 $14,200
182,200
kWh
$14,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs