| Assessment Year | 2005 |
|---|---|
| Principal Product | Refrigeration and food processing pressure vessels |
| NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
48,000
ft2
|
| Annual Production | 1,230
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,666 | 1,110,676 |
kWh
|
$0.062 |
| Electricity Demand | $22,133 | 2,937 |
kW-mo/yr
|
$7.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,951 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,394 | $50 |
$1,033
16,666
kWh
|
$361
-
kW-mo/yr
|
- | |
| 02 | 2.7145: Install skylights | $1,020 | - |
$450
7,236
kWh
|
$570
-
kW-mo/yr
|
- | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $710 | $290 |
$480
7,680
kWh
|
$230
-
kW-mo/yr
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $702 | - |
$414
6,671
kWh
|
$288
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $502 | $400 |
$372
5,994
kWh
|
$130
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $448 | $307 |
$122
1,960
kWh
|
$19
-
kW-mo/yr
|
$307 | |
| 07 | 3.6192: Use a less expensive method of waste removal | $175 | $700 | - | - | $175 | |
| TOTAL RECOMMENDED | $4,951 | $1,747 |
$2,871
46,207
kWh
|
$1,598
-
kW-mo/yr
|
$482 | ||
| TOTAL IMPLEMENTED | $4,951 | $1,747 |
$2,871
46,207
kWh
|
$1,598
-
kW-mo/yr
|
$482 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs