ITAC Assessment: AM0430
ITAC logo
ITAC Assessment: AM0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electronic and hydraulic drilling rig instruments, pressure gauges, weig
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 230,000
ft2
Annual Production 5,590
pieces
Production Hrs. Annual 5,392
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,344 4,978,000
kWh
Electricity Demand $41,870 12,883
kW-mo/yr
Natural Gas $20,400 2,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.8131: Use water-based adhesives $51,560 $10,000 - - $51,560
-
gal
- -
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,620 $340 - - $4,620
-
gal
- -
03 4.652: Replace existing equipment with more suitable substitutes $3,770 $9,000 - - - - $3,770
04 3.6192: Use a less expensive method of waste removal $2,840 $700 - - - $2,840
-
lb
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 - $1,300
24,000
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $850 $77 $700
12,900
kWh
$150
-
kW-mo/yr
- - -
07 3.7132: Reuse rags until completely soiled $795 - - - - $795
-
lb
-
08 2.4221: Install compressor air intakes in coolest locations $280 $90 $250
4,600
kWh
$30
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $630 $260
4,800
kWh
$35
-
kW-mo/yr
- - $(-35.0)
10 2.7124: Make a practice of turning off lights when not needed $180 - $180
3,400
kWh
- - - -
TOTAL RECOMMENDED $66,455 $20,837 $2,690
49,700
kWh
$215
-
kW-mo/yr
$56,180
-
gal
$3,635
-
lb
$3,735
TOTAL IMPLEMENTED $5,965 $777 $2,180
40,300
kWh
$150
-
kW-mo/yr
- $3,635
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs