Assessment Year | 1998 |
---|---|
Principal Product | Wrappers |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 103 |
Plant Area |
105,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,382 | 2,422,333 |
kWh
|
$0.050 |
Electricity Demand | $80,478 | 6,588 |
kW-mo/yr
|
$12.22 |
Electricity Fees | $33,785 | - |
|
- |
Natural Gas | $77,969 | 17,951 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $5,378 | $2,188 |
$5,184
94,959
kWh
|
$194
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,806 | $500 |
$1,551
37,222
kWh
|
$1,255
-
kW-mo/yr
|
- | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $6,709 | $6,300 | - | - |
$6,709
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,138 | $4,120 | - | - |
$3,138
-
MMBtu
|
- | - | |
05 | 3.3122: Use filtration, centrifuging to remove contaminants | $812 | $800 | - | - | - | - |
$812
-
Tgal
|
|
06 | 3.4155: Meter waste water | $599 | $900 | - | - | - | - |
$599
-
Tgal
|
|
07 | 4.431: Train operators for maximum operating efficiency | $5,200 | $100 | - | - | - | $5,200 | - | |
08 | 4.431: Train operators for maximum operating efficiency | $4,161 | $200 | - | - | - | $4,161 | - | |
TOTAL RECOMMENDED | $28,803 | $15,108 |
$6,735
132,181
kWh
|
$1,449
-
kW-mo/yr
|
$9,847
-
MMBtu
|
$9,361 |
$1,411
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs