ITAC Assessment: UM0123
ITAC logo
ITAC Assessment: UM0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wrappers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 105,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,382 2,422,333
kWh
Electricity Demand $80,478 6,588
kW-mo/yr
Electricity Fees $33,785 -
Natural Gas $77,969 17,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,378 $2,188 $5,184
94,959
kWh
$194
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,806 $500 $1,551
37,222
kWh
$1,255
-
kW-mo/yr
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $6,709 $6,300 - - $6,709
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $3,138 $4,120 - - $3,138
-
MMBtu
- -
05 3.3122: Use filtration, centrifuging to remove contaminants $812 $800 - - - - $812
-
Tgal
06 3.4155: Meter waste water $599 $900 - - - - $599
-
Tgal
07 4.431: Train operators for maximum operating efficiency $5,200 $100 - - - $5,200 -
08 4.431: Train operators for maximum operating efficiency $4,161 $200 - - - $4,161 -
TOTAL RECOMMENDED $28,803 $15,108 $6,735
132,181
kWh
$1,449
-
kW-mo/yr
$9,847
-
MMBtu
$9,361 $1,411
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs