Assessment Year | 2001 |
---|---|
Principal Product | Solid and finger joint moldings/frames, closet rounds, wood |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
88,300
ft2
|
Annual Production | 1,676,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,174 | 2,847,146 |
kWh
|
$0.042 |
Electricity Demand | $76,346 | 9,576 |
kW-mo/yr
|
$7.97 |
Natural Gas | $20,553 | 3,807 |
MMBtu
|
$5.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $148,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,055 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $51,050 | $162,000 | n/a |
$(-850.0)
(-30,400)
kWh
|
$(-1,100.0)
-
kW-mo/yr
|
- | - | - | $53,000 | - |
02 | 4.445: Install equipment to move product | $51,050 | $150,000 |
$(-850.0)
(-30,400)
kWh
|
$(-1,100.0)
-
kW-mo/yr
|
- | - | - | $53,000 | - | |
03 | 3.5311: Recover and reuse waste material | $16,100 | - | - | - | - | - |
$16,100
-
lb
|
- | - | |
04 | 2.7231: Use radiant heater for spot heating | $19,350 | $4,700 | - | - |
$2,260
-
MMBtu
|
$17,090
-
MMBtu
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $3,300 | $530 | - | - | - |
$3,300
-
MMBtu
|
- | - | - | |
06 | 3.5311: Recover and reuse waste material | $1,600 | - | - | - | - | - |
$1,600
-
lb
|
- | - | |
07 | 2.8121: Apply for tax-free status for energy purchases | $1,545 | $3,090 | - | - | - | - | - | - | $1,545 | |
08 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,100 | $780 |
$1,100
39,300
kWh
|
- | - | - | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,100 | $200 |
$1,100
39,000
kWh
|
- | - | - | - | - | - | |
10 | 2.7124: Make a practice of turning off lights when not needed | $1,080 | $50 |
$610
11,500
kWh
|
$470
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $960 | $20 |
$410
14,800
kWh
|
$550
-
kW-mo/yr
|
- | - | - | - | - | |
12 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $680 | - |
$680
24,300
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $148,915 | $321,370 |
$2,200
68,100
kWh
|
$(-1,180.0)
-
kW-mo/yr
|
$2,260
-
MMBtu
|
$20,390
-
MMBtu
|
$17,700
-
lb
|
$106,000 | $1,545 | ||
TOTAL IMPLEMENTED | $57,055 | $153,340 |
$1,540
44,400
kWh
|
$(-630.0)
-
kW-mo/yr
|
- | - |
$1,600
-
lb
|
$53,000 | $1,545 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs