ITAC Assessment: AM0346
ITAC logo
ITAC Assessment: AM0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Soft drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 100,000
ft2
Annual Production 3,400,000
pieces
Production Hrs. Annual 2,030
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,726 1,387,456
kWh
Electricity Demand $72,855 8,994
kW-mo/yr
Natural Gas $33,675 7,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 3.4114: Replace city water with recycled water via cooling tower $18,650 $8,000 - - $18,650
-
Tgal
02 2.6231: Utilize controls to operate equipment only when needed $5,300 $15,000 - $5,300
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $390 $200 $390
10,258
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $410 $250 $410
10,844
kWh
- -
05 2.2511: Insulate bare equipment $180 $35 - $180
-
MMBtu
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $180 $140 $180
4,689
kWh
- -
TOTAL RECOMMENDED $25,110 $23,625 $980
25,791
kWh
$5,480
-
MMBtu
$18,650
-
Tgal
TOTAL IMPLEMENTED $24,930 $23,590 $980
25,791
kWh
$5,300
-
MMBtu
$18,650
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs