Assessment Year | 1999 |
---|---|
Principal Product | Oil field rock drill bits |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
201,000
ft2
|
Annual Production | 21,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $811,503 | 31,501,759 |
kWh
|
$0.026 |
Electricity Demand | $292,753 | 70,691 |
kW-mo/yr
|
$4.14 |
Natural Gas | $325,719 | 83,667 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,450 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $161,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $120,400 | - |
$59,900
2,319,754
kWh
|
$60,500
-
kW-mo/yr
|
- | - | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $23,200 | $1,900 |
$23,200
900,352
kWh
|
- | - | - | - | |
03 | 3.7131: Use a rag recycle service | $9,580 | - | - | - | - |
$9,580
-
lb
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,800 | $500 |
$5,800
224,795
kWh
|
- | - | - | - | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $2,700 | $65 | - | - |
$2,700
-
gal
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | - |
$460
17,878
kWh
|
$640
-
kW-mo/yr
|
- | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $730 | - |
$440
16,999
kWh
|
$290
-
kW-mo/yr
|
- | - | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $640 | $230 |
$270
10,551
kWh
|
$370
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $300 | $310 |
$40
1,758
kWh
|
$30
-
kW-mo/yr
|
- | - | $230 | |
TOTAL RECOMMENDED | $164,450 | $3,005 |
$90,110
3,492,087
kWh
|
$61,830
-
kW-mo/yr
|
$2,700
-
gal
|
$9,580
-
lb
|
$230 | ||
TOTAL IMPLEMENTED | $161,750 | $2,940 |
$90,110
3,492,087
kWh
|
$61,830
-
kW-mo/yr
|
- |
$9,580
-
lb
|
$230 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |