ITAC Assessment: MS0352
ITAC logo
ITAC Assessment: MS0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product CIRCUIT BOARDS
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 143
Plant Area 350,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,885 7,329,744
kWh
Electricity Demand $234,986 18,024
kW-mo/yr
Natural Gas $33,868 3,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $92,249 $34,416 $51,565
971,820
kWh
$39,321
-
kW-mo/yr
$1,363
02 2.7221: Lower temperature during the winter season and vice-versa $6,626 $5,300 $6,528
123,023
kWh
- $98
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,061 $389 $3,016
56,833
kWh
- $45
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,750 $9,711 $1,832
334,522
kWh
$1,863
-
kW-mo/yr
$55
05 2.7135: Install occupancy sensors $284 $393 $280
5,270
kWh
- $4
TOTAL RECOMMENDED $105,970 $50,209 $63,221
1,491,468
kWh
$41,184
-
kW-mo/yr
$1,565
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs