Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Mineral fiber products and acoustical tile
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 958,323
ft2
Annual Production 445,850
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,423,056 70,519,680
kWh
Electricity Fees $685,501 -
Natural Gas $5,126,109 1,891,553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,136,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2442: Preheat combustion air with waste heat $529,152 $198,480 - - - $529,152
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $425,529 $1,452,000 $546,736
15,912,000
kWh
$130,257
-
kW-mo/yr
$115,069 $(-366,533.0)
-
MMBtu
-
03 2.7124: Make a practice of turning off lights when not needed $67,886 $1,950 $65,936
1,918,965
kWh
- $1,950 - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $44,270 $30,411 $28,773
837,400
kWh
$9,175
-
kW-mo/yr
$6,322 - -
05 2.7311: Ventilation system to shut off when room is not in use $23,617 $1,500 $19,961
580,949
kWh
- $3,656 - -
06 2.7111: Reduce illumination to minimum necessary levels $20,902 $97 $14,549
423,423
kWh
$3,309
-
kW-mo/yr
$3,044 - -
07 2.4239: Eliminate or reduce compressed air usage $3,779 $1,113 $3,194
92,951
kWh
- $585 - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,971 $696 $2,511
73,089
kWh
- $460 - -
09 3.5316: Contract a wood pallet recycling company $18,200 - - - - - $18,200
-
lb
TOTAL RECOMMENDED $1,136,306 $1,686,247 $681,660
19,838,777
kWh
$142,741
-
kW-mo/yr
$131,086 $162,619
-
MMBtu
$18,200
-
lb
TOTAL IMPLEMENTED $119,155 $5,356 $106,151
3,089,377
kWh
$3,309
-
kW-mo/yr
$9,695 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs