Assessment Year | 2002 |
---|---|
Principal Product | Mineral fiber products and acoustical tile |
NAICS |
n/a
|
SIC | 3296: Mineral Wool |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
958,323
ft2
|
Annual Production | 445,850
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,423,056 | 70,519,680 |
kWh
|
$0.034 |
Electricity Fees | $685,501 | - |
|
- |
Natural Gas | $5,126,109 | 1,891,553 |
MMBtu
|
$2.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,136,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $119,155 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $529,152 | $198,480 | - | - | - |
$529,152
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $425,529 | $1,452,000 |
$546,736
15,912,000
kWh
|
$130,257
-
kW-mo/yr
|
$115,069 |
$(-366,533.0)
-
MMBtu
|
- | |
03 | 2.7124: Make a practice of turning off lights when not needed | $67,886 | $1,950 |
$65,936
1,918,965
kWh
|
- | $1,950 | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $44,270 | $30,411 |
$28,773
837,400
kWh
|
$9,175
-
kW-mo/yr
|
$6,322 | - | - | |
05 | 2.7311: Ventilation system to shut off when room is not in use | $23,617 | $1,500 |
$19,961
580,949
kWh
|
- | $3,656 | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $20,902 | $97 |
$14,549
423,423
kWh
|
$3,309
-
kW-mo/yr
|
$3,044 | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $3,779 | $1,113 |
$3,194
92,951
kWh
|
- | $585 | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,971 | $696 |
$2,511
73,089
kWh
|
- | $460 | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $18,200 | - | - | - | - | - |
$18,200
-
lb
|
|
TOTAL RECOMMENDED | $1,136,306 | $1,686,247 |
$681,660
19,838,777
kWh
|
$142,741
-
kW-mo/yr
|
$131,086 |
$162,619
-
MMBtu
|
$18,200
-
lb
|
||
TOTAL IMPLEMENTED | $119,155 | $5,356 |
$106,151
3,089,377
kWh
|
$3,309
-
kW-mo/yr
|
$9,695 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs