ITAC Assessment: AM0302
ITAC logo
ITAC Assessment: AM0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product blowers and fans
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 31,780
ft2
Annual Production 63,250
pieces
Production Hrs. Annual 2,598
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,671 643,611
kWh
Electricity Demand $27,255 4,292
kW-mo/yr
Natural Gas $3,153 670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,080 $295 - - - - $4,080
-
lb
-
02 2.6218: Turn off equipment when not in use $800 - $340
7,913
kWh
$460
-
kW-mo/yr
- - - -
03 4.231: Purchase equipment instead of leasing $610 - - - - - - $610
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $300 $540
12,603
kWh
- - - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $520 - $520
12,016
kWh
- - - - -
06 3.7131: Use a rag recycle service $470 $33 - - - - - $470
07 3.5315: Lease / purchase baler; sell cardboard to recycler $220 - - - - - $220
-
lb
-
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $210 - $210
4,689
kWh
- - - - -
09 2.7124: Make a practice of turning off lights when not needed $180 - $180
4,103
kWh
- - - - -
10 3.8133: Convert to aqueous cleaning $150 - - - $(-220.0)
-
gal
$370
-
gal
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $140 $70 $80
1,758
kWh
$60
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $7,920 $698 $1,870
43,082
kWh
$520
-
kW-mo/yr
$(-220.0)
-
gal
$370
-
gal
$4,300
-
lb
$1,080
TOTAL IMPLEMENTED $6,240 $595 $1,090
25,205
kWh
$460
-
kW-mo/yr
- - $4,080
-
lb
$610
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs