| Assessment Year | 1993 |
|---|---|
| Principal Product | down hole oil well euipment |
| NAICS |
n/a
|
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 687,000
pieces
|
| Production Hrs. Annual | 5,192
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $301,390 | 5,338,511 |
kWh
|
$0.056 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,332 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,990 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $6,380 | $20,925 |
$6,380
-
kWh
|
- | |
| 02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $7,055 | $1,160 |
$4,235
159,730
kWh
|
$2,820
-
MMBtu
|
|
| 03 | 2.7226: Use computer programs to optimize hvac performance | $3,568 | $3,090 |
$3,568
-
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $1,650 | $7,350 |
$1,650
61,841
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,470 | $420 |
$1,470
55,686
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $990 | $2,140 |
$990
37,515
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $390 | $1,000 |
$390
14,654
kWh
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $530 | $153 |
$530
9,086
kWh
|
- | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $299 | - |
$299
7,034
kWh
|
- | |
| TOTAL RECOMMENDED | $22,332 | $36,238 |
$19,512
345,546
kWh
|
$2,820
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,990 | $2,713 |
$2,990
102,287
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs