ITAC Assessment: AM0168
ITAC logo
ITAC Assessment: AM0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product down hole oil well euipment
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area
n/a
Annual Production 687,000
pieces
Production Hrs. Annual 5,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,390 5,338,511
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,380 $20,925 $6,380
-
kWh
-
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $7,055 $1,160 $4,235
159,730
kWh
$2,820
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $3,568 $3,090 $3,568
-
kWh
-
04 2.7261: Install timers and/or thermostats $1,650 $7,350 $1,650
61,841
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,470 $420 $1,470
55,686
kWh
-
06 2.2511: Insulate bare equipment $990 $2,140 $990
37,515
kWh
-
07 2.2437: Recover waste heat from equipment $390 $1,000 $390
14,654
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $530 $153 $530
9,086
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $299 - $299
7,034
kWh
-
TOTAL RECOMMENDED $22,332 $36,238 $19,512
345,546
kWh
$2,820
-
MMBtu
TOTAL IMPLEMENTED $2,990 $2,713 $2,990
102,287
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs