ITAC Assessment: AM0163
ITAC logo
ITAC Assessment: AM0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SALT
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 120,530
ton
Production Hrs. Annual 7,872
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,568 4,365,182
kWh
Natural Gas $611,973 389,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $18,300 $35,000 $18,300
-
kWh
-
02 2.2135: Repair and eliminate steam leaks $2,440 $1,240 - $2,440
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,420 $1,360 $1,420
29,308
kWh
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $620 $270 $620
10,258
kWh
-
05 2.7261: Install timers and/or thermostats $330 - $330
9,086
kWh
-
TOTAL RECOMMENDED $23,110 $37,870 $20,670
48,652
kWh
$2,440
-
MMBtu
TOTAL IMPLEMENTED $21,070 $36,240 $18,630
9,086
kWh
$2,440
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs