ITAC Assessment: AM0159
ITAC logo
ITAC Assessment: AM0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL SHIPPING CONTAINERS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 242,000
ft2
Annual Production 1,320,000
pieces
Production Hrs. Annual 4,233
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,208 4,800,703
kWh
Natural Gas $217,984 94,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $9,900 $26,500 $9,900
-
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $5,980 $22,500 - $5,980
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $3,680 $14,340 - $3,680
-
MMBtu
04 2.6232: Install set-back timers $2,200 - $2,200
49,824
kWh
-
05 2.2511: Insulate bare equipment $490 $690 - $490
-
MMBtu
06 2.2511: Insulate bare equipment $244 $440 - $244
-
MMBtu
TOTAL RECOMMENDED $22,494 $64,470 $12,100
49,824
kWh
$10,394
-
MMBtu
TOTAL IMPLEMENTED $12,344 $26,940 $12,100
49,824
kWh
$244
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs