ITAC Assessment: LS1812
ITAC logo
ITAC Assessment: LS1812
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Portable Drinking Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 240,000
ft2
Annual Production 17,000
Tgal
Production Hrs. Annual 3,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,850 3,666,910
kWh
Natural Gas $48,022 4,991
MMBtu
Waste Disposal Costs
Water Usage $32,177 2,347
Tgal
TOTAL YEARLY COSTS $439,049
RECOMMENDED SAVINGS* $51,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,387 $50 $2,387
24,389
kWh
-
02 2.2437: Recover waste heat from equipment $17,980 $20,000 - $17,980
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,886 $17,000 $22,886
233,535
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,243 $13,500 $8,243
84,236
kWh
-
TOTAL RECOMMENDED $51,496 $50,550 $33,516
342,160
kWh
$17,980
-
MMBtu
TOTAL IMPLEMENTED $22,886 $17,000 $22,886
233,535
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs