ITAC Assessment: AM0158
ITAC logo
ITAC Assessment: AM0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product METAL CLEANING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 430
Plant Area
n/a
Annual Production 9,600,000
lb
Production Hrs. Annual 6,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,692 9,296,600
kWh
Natural Gas $275,328 97,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,797 $7,379 $14,475
260,258
kWh
- $(-678.0)
02 2.6232: Install set-back timers $29,200 $19,590 $29,200
498,242
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $17,300 $21,640 - $17,300
-
MMBtu
-
04 2.3212: Optimize plant power factor $11,800 $32,000 $11,800
-
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,200 $960 $6,200
241,501
kWh
- -
06 2.2511: Insulate bare equipment $4,370 $4,050 - $4,370
-
MMBtu
-
07 2.2135: Repair and eliminate steam leaks $3,780 $870 - $3,780
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,190 $1,150 - $3,700
-
MMBtu
$(-1,510.0)
09 2.2511: Insulate bare equipment $1,760 $5,950 - $1,760
-
MMBtu
-
10 2.2531: Re-size charging openings or add movable cover or door $1,600 $170 - $1,600
-
MMBtu
-
11 2.8123: Pay utility bills on time $1,213 - $1,213
-
kWh
- -
12 2.6212: Turn off equipment during breaks, reduce operating time $425 - $425
16,413
kWh
- -
TOTAL RECOMMENDED $93,635 $93,759 $63,313
1,016,414
kWh
$32,510
-
MMBtu
$(-2,188.0)
TOTAL IMPLEMENTED $29,205 $10,529 $22,313
518,172
kWh
$9,080
-
MMBtu
$(-2,188.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs