ITAC Assessment: AM0151
ITAC logo
ITAC Assessment: AM0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TURBULATORS,HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 4,800
pieces
Production Hrs. Annual 2,453
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,198 1,348,769
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,535 $6,730 $1,584
10,551
kWh
$(-49.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,460 $530 $1,460
28,429
kWh
-
03 2.8123: Pay utility bills on time $920 - $920
-
kWh
-
04 2.6232: Install set-back timers $730 $300 $730
14,361
kWh
-
05 2.6232: Install set-back timers $460 - $460
5,275
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $460 - $460
6,448
kWh
-
07 2.6232: Install set-back timers $167 - $167
3,224
kWh
-
TOTAL RECOMMENDED $5,732 $7,560 $5,781
68,288
kWh
$(-49.0)
TOTAL IMPLEMENTED $4,030 $830 $4,030
54,513
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs