ITAC Assessment: TA0127
ITAC logo
ITAC Assessment: TA0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Beverage Syrup
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area 250,000
ft2
Annual Production 74,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $647,062 7,314,132
kWh
Electricity Demand $98,534 14,349
kW-mo/yr
Natural Gas $158,738 19,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,934 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $4,212 - - $4,212
-
kW-mo/yr
-
02 2.1134: Eliminate leaks in combustible gas lines $625 $100 - - $625
-
MMBtu
03 2.7495: Install replacement doors $285 $486 $285
3,319
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,752 - $2,302
26,800
kWh
$450
-
kW-mo/yr
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $60 $93 $60
698
kWh
- -
TOTAL RECOMMENDED $7,934 $679 $2,647
30,817
kWh
$4,662
-
kW-mo/yr
$625
-
MMBtu
TOTAL IMPLEMENTED $7,589 $100 $2,302
26,800
kWh
$4,662
-
kW-mo/yr
$625
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs