ITAC Assessment: AM0148
ITAC logo
ITAC Assessment: AM0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product OFFICE CHAIRS
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 750,000
pieces
Production Hrs. Annual 2,445
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,362 1,177,022
kWh
Natural Gas $22,646 4,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,055

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $1,800 $400 - $1,800
-
MMBtu
-
02 2.2511: Insulate bare equipment $1,275 $1,275 $1,275
50,996
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $496 $420 $496
19,930
kWh
- -
04 2.6232: Install set-back timers $354 $350 $354
10,258
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $130 - $154
879
kWh
- $(-24.0)
06 2.2511: Insulate bare equipment $140 $200 $140
5,569
kWh
- -
TOTAL RECOMMENDED $4,195 $2,645 $2,419
87,632
kWh
$1,800
-
MMBtu
$(-24.0)
TOTAL IMPLEMENTED $4,055 $2,445 $2,279
82,063
kWh
$1,800
-
MMBtu
$(-24.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs