ITAC Assessment: AM0147
ITAC logo
ITAC Assessment: AM0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product INDUSTRIAL CHEMICALS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 10,773
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $644,170 14,586,753
kWh
Natural Gas $217,693 118,764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,460 $9,780 - $15,460
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $9,110 $2,000 - $9,110
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,600 $540 - $7,600
-
MMBtu
04 2.6232: Install set-back timers $3,830 $90 $3,830
84,115
kWh
-
05 2.4312: Improve lubrication practices $2,430 - $2,430
57,151
kWh
-
06 2.2121: Increase amount of condensate returned $1,020 $870 - $1,020
-
MMBtu
07 2.6232: Install set-back timers $870 $1,580 $870
20,516
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $690 $125 $690
26,964
kWh
-
TOTAL RECOMMENDED $41,010 $14,985 $7,820
188,746
kWh
$33,190
-
MMBtu
TOTAL IMPLEMENTED $37,560 $14,115 $5,390
131,595
kWh
$32,170
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs