ITAC Assessment: AM0145
ITAC logo
ITAC Assessment: AM0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MILITARY READY-EAT MEALS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 260
Plant Area
n/a
Annual Production 20,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,143 1,620,750
kWh
Natural Gas $62,856 22,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $11,180 $7,575 - $11,180
-
MMBtu
-
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,000 $4,000 $1,000
28,136
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $208 $270 - $208
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $24 $1,240 $58
879
kWh
- $(-34.0)
05 2.6232: Install set-back timers $215 $155 $215
6,155
kWh
- -
TOTAL RECOMMENDED $12,627 $13,240 $1,273
35,170
kWh
$11,388
-
MMBtu
$(-34.0)
TOTAL IMPLEMENTED $12,627 $13,240 $1,273
35,170
kWh
$11,388
-
MMBtu
$(-34.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs