ITAC Assessment: AM0144
ITAC logo
ITAC Assessment: AM0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HARDWOOD LUMBER
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 5,800
thousand feet
Production Hrs. Annual 4,426
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,610 1,010,258
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.6192: Use a less expensive method of waste removal $30,000 - - $30,000
02 2.5123: Reduce fluid flow rates $7,610 $750 $7,610
114,889
kWh
-
03 2.3212: Optimize plant power factor $3,370 $6,000 $3,370
-
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,990 - $1,990
38,101
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $423 $960 $480
7,034
kWh
$(-57.0)
06 2.6232: Install set-back timers $350 - $350
6,741
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $340 $300 $340
6,448
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $260 $510 $260
3,810
kWh
-
TOTAL RECOMMENDED $44,343 $8,520 $14,400
177,023
kWh
$29,943
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs