Assessment Year | 1992 |
---|---|
Principal Product | HARDWOOD LUMBER |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 5,800
thousand feet
|
Production Hrs. Annual | 4,426
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,610 | 1,010,258 |
kWh
|
$0.072 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,343 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $30,000 | - | - | $30,000 | |
02 | 2.5123: Reduce fluid flow rates | $7,610 | $750 |
$7,610
114,889
kWh
|
- | |
03 | 2.3212: Optimize plant power factor | $3,370 | $6,000 |
$3,370
-
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,990 | - |
$1,990
38,101
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $423 | $960 |
$480
7,034
kWh
|
$(-57.0) | |
06 | 2.6232: Install set-back timers | $350 | - |
$350
6,741
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $340 | $300 |
$340
6,448
kWh
|
- | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $260 | $510 |
$260
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $44,343 | $8,520 |
$14,400
177,023
kWh
|
$29,943 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs