ITAC Assessment: AM0142
ITAC logo
ITAC Assessment: AM0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DAIRY,LIVESTOCK,POULTRY
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 22,000
ton
Production Hrs. Annual 2,332
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,794 906,213
kWh
Natural Gas $24,982 5,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $2,900 $4,520 - $2,900
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,890 - $1,890
-
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,420 $2,580 $1,420
32,239
kWh
-
04 2.2135: Repair and eliminate steam leaks $1,390 $800 - $1,390
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $760 - $760
11,723
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $670 $420 $670
14,947
kWh
-
07 2.4133: Use most efficient type of electric motors $1,043 $320 $1,043
12,896
kWh
-
08 2.6218: Turn off equipment when not in use $230 - $230
5,275
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $145 - $145
3,224
kWh
-
TOTAL RECOMMENDED $10,448 $8,640 $6,158
80,304
kWh
$4,290
-
MMBtu
TOTAL IMPLEMENTED $10,448 $8,640 $6,158
80,304
kWh
$4,290
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs