Assessment Year | 1992 |
---|---|
Principal Product | DAIRY,LIVESTOCK,POULTRY |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
n/a
|
Annual Production | 22,000
ton
|
Production Hrs. Annual | 2,332
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,794 | 906,213 |
kWh
|
$0.10 |
Natural Gas | $24,982 | 5,919 |
MMBtu
|
$4.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,448 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $2,900 | $4,520 | - |
$2,900
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,890 | - |
$1,890
-
kWh
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,420 | $2,580 |
$1,420
32,239
kWh
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $1,390 | $800 | - |
$1,390
-
MMBtu
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $760 | - |
$760
11,723
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $670 | $420 |
$670
14,947
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $1,043 | $320 |
$1,043
12,896
kWh
|
- | |
08 | 2.6218: Turn off equipment when not in use | $230 | - |
$230
5,275
kWh
|
- | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $145 | - |
$145
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $10,448 | $8,640 |
$6,158
80,304
kWh
|
$4,290
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,448 | $8,640 |
$6,158
80,304
kWh
|
$4,290
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs