Assessment Year | 2006 |
---|---|
Principal Product | Chemical Product |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
260,000
ft2
|
Annual Production | 5,800,000
ton
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $488,233 | 10,380,284 |
kWh
|
$0.047 |
Electricity Demand | $136,838 | 16,649 |
kW-mo/yr
|
$8.22 |
Natural Gas | $1,225,175 | 292,990 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,435 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $14,689 | $20,194 | - | - |
$14,689
-
MMBtu
|
- | |
02 | 2.4314: Use synthetic lubricant | $3,975 | - |
$2,312
69,200
kWh
|
$1,663
-
kW-mo/yr
|
- | - | |
03 | 3.5217: Reuse / recycle/ sell paper products | $3,293 | $35 | - | - | - |
$3,293
-
lb
|
|
04 | 2.2136: Install / repair insulation on steam lines | $1,855 | $277 | - | - |
$1,855
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1,580 | $826 | - | - |
$1,580
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $258 | $249 | - | - |
$258
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,650 | $21,581 |
$2,312
69,200
kWh
|
$1,663
-
kW-mo/yr
|
$18,382
-
MMBtu
|
$3,293
-
lb
|
||
TOTAL IMPLEMENTED | $3,435 | $1,103 | - | - |
$3,435
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs