ITAC Assessment: AM0137
ITAC logo
ITAC Assessment: AM0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HAMBURGER BUNS & MUFFINS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 32,262,400
pieces
Production Hrs. Annual 7,440
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,683 4,663,834
kWh
Natural Gas $135,653 34,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $25,000 $18,700 - $25,000
-
MMBtu
02 2.2437: Recover waste heat from equipment $13,880 $31,200 - $13,880
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,080 - $3,610
91,735
kWh
$(-1,530.0)
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $360 - $360
7,327
kWh
-
05 2.7261: Install timers and/or thermostats $140 $480 $140
3,517
kWh
-
TOTAL RECOMMENDED $41,460 $50,380 $4,110
102,579
kWh
$37,350
-
MMBtu
TOTAL IMPLEMENTED $2,440 - $3,970
99,062
kWh
$(-1,530.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs