Assessment Year | 1991 |
---|---|
Principal Product | HYDRAULIC CYLINDER SHAFT |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 36 |
Plant Area |
n/a
|
Annual Production | 8,640,000
thousand feet
|
Production Hrs. Annual | 6,024
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,802 | 2,273,740 |
kWh
|
$0.065 |
Natural Gas | $7,968 | 1,505 |
MMBtu
|
$5.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,941 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,350 | $7,500 |
$7,940
72,392
kWh
|
$(-1,590.0)
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $436 | $3,520 |
$436
9,379
kWh
|
- | |
03 | 2.8114: Change rate schedules or other changes in utility service | $1,970 | - |
$1,970
-
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $920 | $940 |
$920
19,930
kWh
|
- | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $620 | $250 |
$620
25,498
kWh
|
- | |
06 | 2.4312: Improve lubrication practices | $410 | - |
$410
7,620
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $530 | $285 |
$530
21,688
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $215 | $130 |
$215
4,689
kWh
|
- | |
09 | 2.8114: Change rate schedules or other changes in utility service | $200 | - |
$200
-
kWh
|
- | |
10 | 2.6232: Install set-back timers | $160 | $135 |
$160
3,517
kWh
|
- | |
11 | 2.6218: Turn off equipment when not in use | $130 | $90 | - |
$130
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,941 | $12,850 |
$13,401
164,713
kWh
|
$(-1,460.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs