ITAC Assessment: AM0128
ITAC logo
ITAC Assessment: AM0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HYDRAULIC CYLINDER SHAFT
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 36
Plant Area
n/a
Annual Production 8,640,000
thousand feet
Production Hrs. Annual 6,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,802 2,273,740
kWh
Natural Gas $7,968 1,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,350 $7,500 $7,940
72,392
kWh
$(-1,590.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $436 $3,520 $436
9,379
kWh
-
03 2.8114: Change rate schedules or other changes in utility service $1,970 - $1,970
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $940 $920
19,930
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $620 $250 $620
25,498
kWh
-
06 2.4312: Improve lubrication practices $410 - $410
7,620
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $530 $285 $530
21,688
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $215 $130 $215
4,689
kWh
-
09 2.8114: Change rate schedules or other changes in utility service $200 - $200
-
kWh
-
10 2.6232: Install set-back timers $160 $135 $160
3,517
kWh
-
11 2.6218: Turn off equipment when not in use $130 $90 - $130
-
MMBtu
TOTAL RECOMMENDED $11,941 $12,850 $13,401
164,713
kWh
$(-1,460.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs