ITAC Assessment: AM0121
ITAC logo
ITAC Assessment: AM0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BEEF & CHICKEN PRODUCTS
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 1,500,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,349 2,535,756
kWh
Natural Gas $11,318 2,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $21,900 $17,552 $21,900
-
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,345 $600 $1,345
31,067
kWh
- -
03 2.7261: Install timers and/or thermostats $1,150 $800 - $1,150
-
MMBtu
-
04 2.4312: Improve lubrication practices $520 - $520
12,016
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $180 - $248
4,103
kWh
- $(-68.0)
06 3.4154: Eliminate leaks in water lines and valves $515 - - $25
-
MMBtu
$490
TOTAL RECOMMENDED $25,610 $18,952 $24,013
47,186
kWh
$1,175
-
MMBtu
$422
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs