ITAC Assessment: AM0108
ITAC logo
ITAC Assessment: AM0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COOLING TOWER PARTS
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 2,770,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,562 1,612,544
kWh
Natural Gas $2,789 590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,366 - $3,660
60,375
kWh
- $(-294.0)
02 2.4322: Use or replace with energy efficient substitutes $5,700 $12,000 $5,700
111,372
kWh
- -
03 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,750 - $3,750
55,979
kWh
- -
04 2.6218: Turn off equipment when not in use $1,400 $103 $1,400
28,136
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $60 $80
1,172
kWh
- -
06 2.7261: Install timers and/or thermostats $235 $181 - $235
-
MMBtu
-
07 2.2511: Insulate bare equipment $96 $426 $96
1,758
kWh
- -
TOTAL RECOMMENDED $14,627 $12,770 $14,686
258,792
kWh
$235
-
MMBtu
$(-294.0)
TOTAL IMPLEMENTED $14,627 $12,770 $14,686
258,792
kWh
$235
-
MMBtu
$(-294.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs