Assessment Year | 1991 |
---|---|
Principal Product | COOLING TOWER PARTS |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 2,770,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,562 | 1,612,544 |
kWh
|
$0.065 |
Natural Gas | $2,789 | 590 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,627 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,366 | - |
$3,660
60,375
kWh
|
- | $(-294.0) | |
02 | 2.4322: Use or replace with energy efficient substitutes | $5,700 | $12,000 |
$5,700
111,372
kWh
|
- | - | |
03 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $3,750 | - |
$3,750
55,979
kWh
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $1,400 | $103 |
$1,400
28,136
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $80 | $60 |
$80
1,172
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $235 | $181 | - |
$235
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $96 | $426 |
$96
1,758
kWh
|
- | - | |
TOTAL RECOMMENDED | $14,627 | $12,770 |
$14,686
258,792
kWh
|
$235
-
MMBtu
|
$(-294.0) | ||
TOTAL IMPLEMENTED | $14,627 | $12,770 |
$14,686
258,792
kWh
|
$235
-
MMBtu
|
$(-294.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs