Assessment Year | 1990 |
---|---|
Principal Product | ACRYLIC & GLASS SKYLIGHT |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
n/a
|
Annual Production | 13,850
pieces
|
Production Hrs. Annual | 1,900
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,736 | 225,088 |
kWh
|
$0.083 |
Natural Gas | $1,145 | 209 |
MMBtu
|
$5.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $846 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $203 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125 | $60 |
$125
1,465
kWh
|
- | - | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $232 | $900 |
$232
3,810
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $170 | $187 |
$210
3,517
kWh
|
- | $(-40.0) | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $105 | $80 | - |
$105
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $76 | $69 |
$76
1,172
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $67 | - |
$67
1,172
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $38 | $194 | - |
$38
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $33 | $33 |
$33
586
kWh
|
- | - | |
TOTAL RECOMMENDED | $846 | $1,523 |
$743
11,722
kWh
|
$143
-
MMBtu
|
$(-40.0) | ||
TOTAL IMPLEMENTED | $203 | $220 |
$243
4,103
kWh
|
- | $(-40.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs