ITAC Assessment: AM0099
ITAC logo
ITAC Assessment: AM0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ENAMELED STEEL PLUMBING
NAICS
n/a
SIC 3431: Enameled Iron and Metal Sanitary Ware
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 633,000
pieces
Production Hrs. Annual 5,832
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,720 5,704,572
kWh
Natural Gas $155,149 50,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $10,480 $14,890 $(-1,460.0)
(-35,170)
kWh
$11,940
-
MMBtu
-
02 2.2531: Re-size charging openings or add movable cover or door $7,860 $5,600 $7,860
261,430
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $5,680 - $5,680
-
kWh
- -
04 2.8114: Change rate schedules or other changes in utility service $5,330 $3,000 $5,330
-
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $4,710 $1,600 $4,710
150,352
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,180 $1,200 $4,180
132,767
kWh
- -
07 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,800 $15,200 - $3,800
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,629 $13,300 $3,576
67,702
kWh
- $53
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,200 $12,390 $2,200
70,047
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,416 $400 $1,416
28,429
kWh
- -
11 2.4221: Install compressor air intakes in coolest locations $750 $1,060 $750
24,033
kWh
- -
12 2.6232: Install set-back timers $739 $52 $739
21,102
kWh
- -
13 2.8121: Apply for tax-free status for energy purchases $250 $500 - $250
-
MMBtu
-
14 2.6232: Install set-back timers $170 $135 $158
4,396
kWh
- $12
TOTAL RECOMMENDED $51,194 $69,327 $35,139
725,088
kWh
$15,990
-
MMBtu
$65
TOTAL IMPLEMENTED $21,224 $18,452 $20,921
250,000
kWh
$250
-
MMBtu
$53
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs