ITAC Assessment: AM0066
ITAC logo
ITAC Assessment: AM0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product RUBBER OIL-WELL EQUIPMENT
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area
n/a
Annual Production 11,100
pieces
Production Hrs. Annual 4,583
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,599 1,361,958
kWh
Natural Gas $19,812 4,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 4.231: Purchase equipment instead of leasing $5,300 $1,750 - - $5,300
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,770 $250 $2,770
63,599
kWh
- -
03 2.2437: Recover waste heat from equipment $1,340 $650 - $1,340
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $1,300 $2,400 - $1,300
-
MMBtu
-
05 2.4312: Improve lubrication practices $325 - $325
7,327
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $64 $176 $64
879
kWh
- -
TOTAL RECOMMENDED $11,099 $5,226 $3,159
71,805
kWh
$2,640
-
MMBtu
$5,300
TOTAL IMPLEMENTED $9,370 $4,400 $2,770
63,599
kWh
$1,300
-
MMBtu
$5,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs