ITAC Assessment: AM0062
ITAC logo
ITAC Assessment: AM0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product OILFIELD VALVES & EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 2,912
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,591 625,147
kWh
Natural Gas $7,335 1,626
MMBtu
Other Energy $6,240 811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,350 $3,160 $2,350
56,272
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,090 $7,752 $2,090
35,170
kWh
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $1,440 $2,000 - $1,440
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $828 $500 $828
19,930
kWh
- -
05 2.8227: Adjust / maintain fork lift trucks for most efficient operation $624 $420 - - $624
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $95 $119
2,052
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $300 $105 $300
5,569
kWh
- -
08 2.6232: Install set-back timers $116 - $116
2,931
kWh
- -
TOTAL RECOMMENDED $7,867 $14,032 $5,803
121,924
kWh
$1,440
-
MMBtu
$624
-
MMBtu
TOTAL IMPLEMENTED $1,987 $1,120 $1,363
30,482
kWh
- $624
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs