| Assessment Year | 1989 |
|---|---|
| Principal Product | STEEL |
| NAICS |
n/a
|
| SIC | 3449: Miscellaneous Structural Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 10,000
ton
|
| Production Hrs. Annual | 2,016
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,163 | 396,542 |
kWh
|
$0.086 |
| Natural Gas | $10,374 | 2,511 |
MMBtu
|
$4.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,717 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,150 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,105 | $2,176 |
$2,105
29,015
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,382 | $300 |
$1,382
28,722
kWh
|
- | |
| 03 | 2.7141: Lower light fixtures in high ceiling areas | $845 | $840 |
$845
11,430
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $495 | $1,000 | - |
$495
-
MMBtu
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $325 | - | - |
$325
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $62 | $15 |
$62
879
kWh
|
- | |
| 07 | 2.4312: Improve lubrication practices | $227 | - |
$227
4,689
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $166 | $340 |
$166
3,517
kWh
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $110 | - |
$110
2,345
kWh
|
- | |
| TOTAL RECOMMENDED | $5,717 | $4,671 |
$4,897
80,597
kWh
|
$820
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,150 | $2,831 |
$3,825
64,478
kWh
|
$325
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs