ITAC Assessment: AM0059
ITAC logo
ITAC Assessment: AM0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STEEL
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 2,016
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,163 396,542
kWh
Natural Gas $10,374 2,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,105 $2,176 $2,105
29,015
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,382 $300 $1,382
28,722
kWh
-
03 2.7141: Lower light fixtures in high ceiling areas $845 $840 $845
11,430
kWh
-
04 2.2437: Recover waste heat from equipment $495 $1,000 - $495
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $325 - - $325
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $62 $15 $62
879
kWh
-
07 2.4312: Improve lubrication practices $227 - $227
4,689
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $166 $340 $166
3,517
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $110 - $110
2,345
kWh
-
TOTAL RECOMMENDED $5,717 $4,671 $4,897
80,597
kWh
$820
-
MMBtu
TOTAL IMPLEMENTED $4,150 $2,831 $3,825
64,478
kWh
$325
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs