Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product LIVESTOCK & POULTRY FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 140,000
ton
Production Hrs. Annual 6,072
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,582 1,657,972
kWh
Natural Gas $26,141 6,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $4,790 $7,577 $(-372.0)
(-11,430)
kWh
$5,162
-
MMBtu
02 2.2437: Recover waste heat from equipment $1,070 $700 - $1,070
-
MMBtu
03 2.6232: Install set-back timers $970 - $970
16,706
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $849 $960 $849
26,084
kWh
-
05 2.3132: Recharge batteries on during off-peak demand periods $430 - $430
-
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $250 $250 $250
10,258
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $200 $250 $200
8,499
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $20 $4 $20
586
kWh
-
TOTAL RECOMMENDED $8,579 $9,741 $2,347
50,703
kWh
$6,232
-
MMBtu
TOTAL IMPLEMENTED $2,310 $954 $1,240
27,550
kWh
$1,070
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs