Assessment Year | 1989 |
---|---|
Principal Product | LIVESTOCK & POULTRY FEED |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 140,000
ton
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,582 | 1,657,972 |
kWh
|
$0.044 |
Natural Gas | $26,141 | 6,616 |
MMBtu
|
$3.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,310 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $4,790 | $7,577 |
$(-372.0)
(-11,430)
kWh
|
$5,162
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $1,070 | $700 | - |
$1,070
-
MMBtu
|
|
03 | 2.6232: Install set-back timers | $970 | - |
$970
16,706
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $849 | $960 |
$849
26,084
kWh
|
- | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $430 | - |
$430
-
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $250 | $250 |
$250
10,258
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $200 | $250 |
$200
8,499
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20 | $4 |
$20
586
kWh
|
- | |
TOTAL RECOMMENDED | $8,579 | $9,741 |
$2,347
50,703
kWh
|
$6,232
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,310 | $954 |
$1,240
27,550
kWh
|
$1,070
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs