ITAC Assessment: AM0053
ITAC logo
ITAC Assessment: AM0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HEAT TREATED METAL PARTS
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,008
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,806 343,787
kWh
Natural Gas $9,169 2,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,987 $6,125 $(-391.0)
(-4,103)
kWh
$2,378
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,275 $5,730 $1,275
16,999
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $48 $11 $48
586
kWh
-
04 2.6232: Install set-back timers $250 $50 $250
5,275
kWh
-
05 2.6232: Install set-back timers $205 - $205
4,396
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $115 $300 $115
2,638
kWh
-
TOTAL RECOMMENDED $3,880 $12,216 $1,502
25,791
kWh
$2,378
-
MMBtu
TOTAL IMPLEMENTED $1,688 $6,091 $1,688
25,498
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs